At this point the assembly has passed the inspection station and a pass/fail determination has been made. If the part fails the inspection it will be ejected into the reject bin by a solenoid as it passes the reject area.
Last updated: 2004-09-10.
©2001,2004 Rockwell Automation. All rights reserved.